" The contractor shall provide all tools, testing machines, materials, and men necessary for the required testing, inspection, and weighing at the foundry of the pipes and special castings; and, should the purchaser have no inspector at the works, the contractor... "
The Founder's Manual: A Presentation of Modern Foundry Operations, for the ... - Page 353
by David Wells Payne - 1917 - 676 pages
Full view - About this book

Journal of the New England Water Works Association, Volume 16

New England Water Works Association - Water-supply - 1902 - 508 pages
...so as to read, " And if the pipe is not inspected at the works by the engineer, the contractor shall furnish a sworn statement that all of the tests have been made and the requirements fulfilled, and if the pipe is specially cast to fill a given order the specific...
Full view - About this book

Transactions of the American Institute of Mining, Metallurgical ..., Volume 35

American Institute of Mining, Metallurgical, and Petroleum Engineers, American Institute of Mining Engineers - Metallurgy - 1905 - 1152 pages
...castings ; and, should the purchaser have no inspector at the works, the contractor shall, if required bv the engineer, furnish a sworn statement that all of...statement to contain the results of the tests upon the test-bars. XVII. POWER OP ENGINEER TO INSPECT. — The engineer shall be at liberty at all times to...
Full view - About this book

Cast Iron Pipe: Some Notes and Tables ...

United States Cast Iron Pipe and Foundry Co - Cast-iron pipe - 1906 - 168 pages
...inspection and weighing at-the foundry of the pipe and special castings; and, should the purchaser have no inspector at the works, the contractor shall, if...tests upon the test bars. Power of Engineer to Inspect SECTION 17. The engineer shall be at liberty at all times, to inspect the material at the foundry,...
Full view - About this book

The Iron and Steel Magazine, Volume 7

Iron - 1904 - 704 pages
...inspection and weighing at the foundry of the pipes and special castings ; and, should the purchaser have no inspector at the works, the contractor shall, if...statement to contain the results of the tests upon the test-bars. Class A Pipe 2Olnch Diameter and Larger Pounds per Sq. Inch Less than 2o.inch Diameter Pounds...
Full view - About this book

Hand-book of American Gas-engineering Practice

Nisbet Latta - Gas manufacture and works - 1907 - 502 pages
...inspection, and weighing at the foundry of the pipes and special castings; and, should the purchaser have no inspector at the works, the contractor shall, if...statement to contain the results of the tests upon the testbars. POWER OF ENGINEER TO INSPECT. SECTION 17. The engineer shall be at liberty at all times to...
Full view - About this book

Year-book

American Society for Testing Materials - Building materials - 1910 - 326 pages
...inspection and weighing at the foundry of the pipes and special castings; and, should the purchaser have no inspector at the works, the contractor shall, if required by the engineer, furnish a sworn Class A pipe Class C pipe ... .... Class D pipe statement that all of the tests have been made as specified,...
Full view - About this book

Year-book

Building materials - 1913 - 420 pages
...inspection and weighing at the foundry of the pipes and special castings; and, should the purchaser have no inspector at the works, the contractor shall, if required by the engineer, furnish a swom * 20- Inch Diameter and Larger. Ibs. per sq. in. Less than zo-Inch Diameter. Ibs. per sq. in....
Full view - About this book

Proceedings of the American Gas Institute, Volume 8

American Gas Institute - Gas - 1914 - 936 pages
...inspection and weighing at the foundry of the pipe and special castings ; and should the purchaser have no inspector at the works, the contractor shall, if...upon the test bars. Power of Engineer to Inspect. Section 15. The engineer shall be at liberty at all times to inspect the material at the foundry, and...
Full view - About this book

A.S.T.M. Standards

Materials - 1916 - 806 pages
...inspection and weighing at the foundry of the pipes and special castings; and, should the purchaser have no inspector at the works, the contractor shall, if...upon the test bars. POWER OF ENGINEER TO INSPECT. SECTION 17. The engineer shall be at liberty at all times to inspect the material at the foundry, and...
Full view - About this book

Conveyance and Distribution of Water for Water Supply: Aqueducts, Pipe-lines ...

Edward Wegmann - Hydraulic engineering - 1918 - 712 pages
...Class A Pi|x150 300 Class B Pipe . . ' . 200 300 Class C Pipe 250 300 Class D Pipe 300 300 chaser have no inspector at the works, the contractor shall, if...upon the test bars. Power of Engineer to Inspect. — Section 17. The engineer shall be at liberty at all times to inspect the material at the foundry,...