| 1867 - 296 pages
...and a defective pipe or casting, which may have passed the inspector at the works, or elsewhere, will be at all times liable to rejection when discovered, until the final adjustment and completion 20 of the contract. The payments to be made are predicated on the receipt... | |
| New Hampshire. State Department of Health - New Hampshire - 1886 - 338 pages
...defective pipe or other casting which may have passed the inspector at the works or elsewhere will be at all times liable to rejection when discovered, until the final adjustment and completion of this contract. 32.—SHIPMENT AND DELIVERY. The shipment of the pipes... | |
| 1886 - 340 pages
...defective pipe or other casting which may have passed the inspector at the works or elsewhere will be at all times liable to rejection when discovered, until the final adjustment and completion of this contract. 32. — SHIPMENT AND DELIVERY. The shipment of the pipes... | |
| Edward Wegmann - New York (City) - 1896 - 642 pages
...defective pipe or other castings, which may have passed the inspection at the foundry or elsewhere, will be at all times liable to rejection when discovered until the final adjustment and completion of the contract. (33.) Delivery. — The pipes and other castings, when satisfactory... | |
| New England Water Works Association - Water-supply - 1902 - 508 pages
...relieve the contractor of any of his obligations in this respect, and any defective pipe or other casting which may have passed the engineer at the works or...times liable to rejection when discovered, until the filial completion and adjustment of the contract. Care shall be taken in handling the pipes not to... | |
| United States Cast Iron Pipe and Foundry Co - Cast-iron pipe - 1906 - 168 pages
...castings which may have passed the engineer at the works or elsewhere, shall at all times be subject to rejection when discovered, until the final completion...however, that the contractor shall not be held liable for pipe or special castings found to be cracked after they have been accepted at the agreed point of delivery.... | |
| American Gas Institute - Gas - 1914 - 936 pages
...defective pipe or other castings which may have passed the engineer, shall at all times be subject to rejection when discovered, until the final completion...however, that the contractor shall not be held liable for pipe or special castings found to be cracked after they have been accepted at the agreed point of delivery.... | |
| New England Water Works Association - Water-supply - 1918 - 488 pages
...in this respect, and defective pipes or fittings which may have passed the engineer at the foundry or elsewhere shall be at all times liable to rejection,...the contractor shall not be held liable for pipes or fittings found to be cracked after they have been accepted at the agreed point of delivery. Care shall... | |
| Municipal engineering - 1902 - 600 pages
...relieve the contractor of any of his obligations In this respect, and any defective pipe or other casting which may have passed the engineer at the works or...times liable to rejection when discovered, until the ttnal completion and adjustment of the contract; provided, however, that the contractor shall not be... | |
| |