| Philippines - Law - 1985 - 414 pages
...shall be green. 11 STORAGE The cement shall be stored in such a manner as to permit easy access foe proper inspection and identification of each shipment and in a suitable weathertight building that will protect the cement from dampness and minimize warehouse set. ANNEX A POZZOLAN FOB U&a IN... | |
| William Albert Noyes - Chemistry - 1905 - 808 pages
...weather-tight building having the floor properly blocked or raised from the ground. (4) The cement shall be stored in such a manner as to permit easy access...proper inspection 'and identification of each shipment. (5) Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Edwin Clarence Eckel - Cement - 1905 - 796 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Charles Carroll Brown - Cement - 1905 - 384 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Charles Evan Fowler - Bridges - 1905 - 370 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at cast twelve days allowed for... | |
| W. Purves Taylor - Cement - 1905 - 348 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. — The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. — Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Gilbert Richard Redgrave - Cement - 1905 - 406 pages
...water-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor, and a period of at least twelve days allowed... | |
| Columbus, O. Dept. of public service - 1905 - 162 pages
...weather-tight building having a wooden floor properly blocked or raised from the ground, and in such manner as to permit easy access for proper inspection and identification of each shipment. The Engineer shall be notified at once of each delivery of cement. Every facility shall be provided... | |
| Frederick Putnam Spalding - Cement - 1906 - 346 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| Rolla C. Carpenter - Building materials - 1906 - 908 pages
...weather-tight building having the floor properly blocked or raised from the ground. 4. The cement shall be stored in such a manner as to permit easy access...proper inspection and identification of each shipment. 5. Every facility shall be provided by the contractor and a period of at least twelve days allowed... | |
| |